Research Article |
Evaluation Results Dissemination Strategy and Performance of Highway Construction Projects in Kenya
Author(s) : Leonard Mue Musyoka1*,Reuben W. Kikwatha2,Johnbosco M. Kisimbii3,Anthony W. Ndung’u4
Publisher : FOREX Publication
Published : 30 March 2025
e-ISSN :2347-4696
Page(s) : 1-8
Abstract
The purpose of this study is to examine the influence of evaluation results dissemination strategy on performance of highway construction projects in Kenya. This study was anchored on Utilization-Focused Evaluation (UFE) theory. This research utilized pragmatism research philosophy and correlational design. The target population was 69 Category A road construction projects that have been completed by KeNHA for the period between 2018 and 2022. The respondents in these projects were the project managers in all the 69 highway construction projects in Kenya. The study used a census approach and hence all the projects were included in the study. The research adopted both secondary and primary data. The research involved data collection checklist for secondary data collection from the KeNHA. Secondary data was collected from KeNHA reports and primary data was collected by use of semi-structured questionnaires. While qualitative data was analyzed by of thematic analysis, quantitative data was analyzed using descriptive and inferential statistics. The study found that that evaluation results dissemination strategy has a positive and significant impact on performance of highway construction projects in Kenya. The study recommends that project managers should adopt effective dissemination strategies for evaluation findings to ensure timely and accessible communication with all stakeholders.
Keywords: Evaluation Results Dissemination
, Performance
, Construction Projects
Leonard Mue Musyoka1*, Ph.D. Candidate, Faculty of Business and Management Sciences, University of Nairobi, Kenya; Email: leonardmusyoka@gmail.com
Reuben W. Kikwatha2, Senior Lecturer, Faculty of Business and Management Sciences, University of Nairobi, Kenya;
Johnbosco M. Kisimbii3, Senior Lecturer, Faculty of Business and Management Sciences, University of Nairobi, Kenya;
Anthony W. Ndung’u4, Senior Lecturer, Faculty of Business and Management Sciences, University of Nairobi, Kenya
[1] Amina, M., & Ngugi, L. (2022). Effects of utilization of monitoring and evaluation results on project performance in drought resilience projects by the National Drought Management Authority (NDMA) in Mandera County. European Journal of Social Sciences Studies, 7(5), 105-123. doi:10.11114/jesss.v7i5.5193
[2] Ashcraft, L. E., Quinn, D. A., & Brownson, R. C. (2020). Strategies for effective dissemination of research to United States policymakers: A systematic review. Implementation Science, 15, 89-101.
[3] Baruch, Y., & Holtom, B. (2019). Survey response rate levels and trends in organizational research. Human Relations, 62(8), 1225–1250.
[4] Belay, E., & Tilahun, Y. (2021). The role of black background in creating a sense of mystery and suspense: A conceptual analysis. International Journal of Design, 15(2), 1-13. doi:10.1080/17543924.2021.1902848
[5] Fincham, J. E. (2021). Response rates and responsiveness for surveys, standards, and the role of email. Research in Social and Administrative Pharmacy, 17(8), 1406-1414.
[6] Kenya National Highways Authority. (2022). Strategic Plan 2020/2021 – 2022/2023. [online] Available at:
[7] Locatelli, G., Invernizzi, D.C., & Brookes, N.J. (2017). Project characteristics and performance in Europe: An empirical analysis for large transport infrastructure projects. Transportation Research Part A: Policy and Practice, 98, 108-122. doi: 10.1016/j.tra.2017.01.024
[8] Lubna, H., & Jahaf, A. (2023). The effect of monitoring and evaluation practices on development projects’ performance in Yemen and its relation to gender: Case study on the Yemen Social Fund for Development (SFD). Arab Journal for Scientific Publishing (AJSP), 11, 48-76.
[9] Masvaure, S., & Fish, T.E. (2022). Strengthening and measuring monitoring and evaluation capacity in selected African programmes. African Evaluation Journal, 10(1), 1-18. doi: https://doi.org/10.4102/aej.v10i1.635
[10] Mellahi, K., & Harris, L. C. (2020). Response rates in strategic management research: Past, present, and future directions. Strategic Management Journal, 41(6), 1056–1064.
[11] Ministry of Roads and Highways. (2020). Annual Report on Road Infrastructure Development in Ghana. Accra: Government of Ghana.
[12] Moges, A., & Amare, A. (2018). Evaluation of the Performance of Road Projects in Ethiopia: Cost Overruns and Delays. International Journal of Construction Engineering and Management, 7(1), 1-9.
[13] Muchiri, K., A., & Mose, T. (2022). Project management leadership and successful completion of road construction projects in Kenya National Highways Authority. Journal of Entrepreneurship & Project Management, 6(4), 93–118. doi: 10.53819/81018102t6031
[14] Mugweru, D., & Muchelule, Y. (2022). Project schedule and performance of road construction projects at the Kenya National Highways Authority. Journal of Social Sciences Management and Entrepreneurship, 6(1), 159-169.
[15] Mutekhele, B., Rambo, C., & Nyonje, R. (2018). Data dissemination and use and performance of educational building infrastructural projects: A case of Bungoma County, Kenya. International Journal of Science and Research, 7(10), 57-79.
[16] Mwita, M. (2020). Treasury moves in to cull white elephant projects. Retrieved from https://www.the-star.co.ke
[17] Ndurya, M., & Bii, B. (2019). Turkwel — the Sh6bn white elephant. Retrieved from https://kenyagather.org
[18] Nigeria Bureau of Statistics. (2021). Nigeria’s Infrastructure Report. National Bureau of Statistics.
[19] Office of the Auditor General. (2020). Annual Report on the Performance of Road Construction Projects in Uganda. Kampala: Government of Uganda.
[20] Osvaldo, J., Cícera, C., & Cláudia, M. (2021). Information technology in the dissemination of results of the primary health care evaluation in Brazil: A qualitative study. Research Square, 12, 90-118. doi: https://doi.org/10.21203/rs.3.rs-638947/v1
[21] Patanaku, P., Kwak, Y. & Liu, M. (2016). What impacts the performance of large-scale government projects? International Journal of Project Management, 34, 452-466. doi: https://doi.org/10.1016/j.ijproman.2015.12.001
[22] Patton, M. Q. (1978). Utilization-Focused Evaluation. Beverly Hills, CA: SAGE Publications.
[23] Patton, M. Q. (2018). Evaluation Science. American Journal of Evaluation, 39(2), 183–200. https://doi.org/10.1177/1098214018763121
[24] Rehman, R. & Shaikh, S. (2017). Utilization focused evaluation at Bahria University Medical and Dental College. Pakistan Journal of Medical Science, 33(4), 849-853. doi: 10.12669/pjms.334.13020
[25] Schurink, E., & Schurink, W. (2019). Utilization-focused evaluation as a tool in the development of a participative democratic society. Administration Publica, 17(4), 50-69. doi: 101.01.07.2019
[26] Winiko, S. M., Mbugua, J., & Kyalo, D.N. (2018). The role of dissemination of monitoring and evaluation results in the promotion of performance of digital education technology project in Malawi. Journal of Educational Research, 3(121), 26-44.
Leonard Mue Musyoka, Reuben W. Kikwatha, Johnbosco M. Kisimbii, and Anthony W. Ndung’u (2025), Evaluation Results Dissemination Strategy and Performance of Highway Construction Projects in Kenya . IJBMR 13(1), 1-8. DOI: 10.37391/IJBMR.130101.